Part 3: MCQ on Production Planning and Control
The planning activity is always ______.
A. Post-operation
B. Pre-operation
C. Pro-operation
D. After-operation
View Answer
B. Pre-operation
Production planning and control function is essentially required for efficient and economical ________.
A. Promotion
B. Personnel
C. Production
D. Prescription
View Answer
C. Production
The control activity is done _______ or implementation of the plan.
A. Before Implementation
B. Before execution
C. After execution
D. Before planning
View Answer
C. After execution
Optimum utilisation of capacity, inventory control, economy in production time and quality assurance are the _______ of Product Planning and control (PPC).
A. Constraints
B. Merits
C. Demerits
D. Limitations
View Answer
B. Merits
______ involves looking ahead anticipating bottlenecks and identify the steps required for smooth and uninterrupted flow of production.
A. Production control
B. Production Audit
C. Production Planning
D. Production Execution
View Answer
C. Production Planning
The objective of ______ is to regulate and control the various operations of production processes for orderly flow of material.
A. Production control
B. Production Audit
C. Production Planning
D. Production Execution
View Answer
A. Production control
______ involves taking remedial action to fill the gap or to modify the failure.
A. Production control
B. Production Audit
C. Production Planning
D. Production Execution
View Answer
A. Production control
When the size of an organisation increases, then there should be some ______ of production control functions.
A. Centralisation
B. Decentralization
C. Recentralization
D. All of the above
View Answer
C. Production
Production planning involves forward thinking regarding remedial action in case of any failure.
A. Production control
B. Production Audit
C. Production Planning
D. Production Execution
View Answer
C. Production Planning
______ is the execution of the schedule plan as per the root chalked out.
A. Routing
B. Scheduling
C. Loading
D. Sequencing
View Answer
C. Loading
______ is concerned with determining the order in which jobs are processed.
A. Routing
B. Scheduling
C. Loading
D. Sequencing
View Answer
D. Sequencing
______ is about analysis and determine of the time required to perform each operation.
A. Routing
B. Scheduling
C. Loading
D. Sequencing
View Answer
B. Scheduling
______ is concerned with establishing path and sequence of the operations.
A. Routing
B. Scheduling
C. Loading
D. Sequencing
View Answer
A. Routing
______ is to make a tentative idea regarding the operation timings manpower requirement capacity of machine and material requirements to plan the production.
A. Expediting
B. Dispatching
C. Estimating
D. Routing
View Answer
C. Estimating
______ deals with the issue of production orders for initiating the operations
A. Expediting
B. Dispatching
C. Estimating
D. Routing
View Answer
B. Dispatching
______ involves determination of the progress of work by removing bottlenecks
A. Expediting
B. Dispatching
C. Estimating
D. Routing
View Answer
A. Expediting
This is all about MCQ Questions on Production and Operations Management useful for Engineering, Commerce and management students.